Friday, March 8, 2019

OPERATING AND MAINTENANCE INSTRUCTIONS

OPERATING AND MAINTENANCE INSTRUCTIONS



1 M VX_3-2 VXT

Cooling Towers VXI

Closed Circuit Cooling Towers VXC

Evaporative Condensers Baltimore Aircoil Company equipment needs to be properly installed, operated and maintained. Documentation of the equipment used, including a drawing, technical data sheet and this manual should be kept on record. To achieve long, trouble-free and safe operation, it is necessary to establish an operating plan including a programme of regular inspection, monitoring and maintenance. All inspections, maintenance and monitoring actions should be recorded in a cooling system logbook. The operating and maintenance instructions published here can be used as a guide to achieve these goals. In addition to establishing the operating plan and the cooling system logbook it is recommended to conduct a cooling system risk analysis, preferably by an independent third party. For the cooling system, scale, corrosion and biological control must be established and initiated when the system is first filled with water and administered on a regular basis thereafter in accordance with recognized Codes of Practice, (such as EUROVENT 9 - 5/6, ACOP HSC L8, Guide des bonnes pratiques, Legionella et tours aéroréfrigérantes, etc.). Water sampling, test results and corrective actions should be recorded in the cooling system logbook. For more specific recommendations on keeping your cooling system efficient and safe, contact your local BAC Balticare representative. 

No comments:

Post a Comment

KFC Fried Chicken

KFC Fried Chicken Simply heat your oil to 350 or 360 degrees and leave each piece in for exactly 12 minutes. \ Combine KFC’s secre...